-
Quoting from the PDF:Quote:- The newly built track must be an extension to a route already available to the railroad building it.
This is false for 1830. The only requirement in 1830 is that the company laying the tile is able to reach the hex (ie be able to reach track on the tile before it is upgrading, OR be able to reach track on the tile after it is placed). This is different from almost every other 18xx.
|
|
|




